- Overview
- Product Description
- Product Parameters
- Detailed Photos
- Industry products
- Recommended products
- Application
- Company Profile
- Transport &FAQ
Basic Info.
Product Description
Product name: Clinker Cooler Monitoring Camera System
Product model: LM-OL500
Product Introduction | 1. Furnace Handle,it applies to all kinds of high temperature furnaces. |
2. It applies to the furnace that the thickness of furnace wall is around 500mm. | |
3. Probe hood is made of stainless steel,with good corrosion resistance. | |
4. Special spiral air curtain,the lens does not gather dust. | |
5. Special air and water cooling ,the device can be used in all kinds of bad conditions normally. | |
6. Sapphire heat resisting lens. | |
7. Probe hood entry and exit automatically. | |
8. Use heat resisting cylinder,with good reliability. | |
9. Probe hood will exit automatically if there is any accident on power or water/air cooling. | |
10. Central control room or project site can control the equipment to entry or exit. | |
11. PLC procedural control,DCS software control camera menu and aperture. | |
12. Use the 500 mm high temperature optical pinhole lens. | |
13. Use 27 x optical zoom (electronic zoom3.6-78 ) integrated camera. | |
Main Function Probe Will Exit | 1. Temperature of the hood rises above 50°C (specified levels). |
2. Compressed air input air pressure below 0.3 MPa. | |
3. Probe hood cooling water input flow is less than 0.2M³/h. | |
4. Power is cut off. | |
5. Control room or control device of project site send out exit signal. | |
6. Alarm signal can be connected to the DCS. |
Technical Parameters | 1. Resolution: 1920*1080 |
2. Zoom: (electronic zoom3.6-78 ) 27 x optical zoom | |
3. Exit distance: 550mm 4. Angle of view: 17°-81° focus or zoom 5. Lens aperture: electric remote control or manual control 6. Signal Noise Ratio: 56db 7. Colour filter device: can choose red, yellow to filter or panchromatic filtration | |
Compressed Air | 1. Total intake pipe: G1" |
2. Connecting pipe: 4-G1/2" | |
3. Inlet pressure: 0.3~0.7MPa | |
4. Inlet temperature: ≤35°C | |
5. Minimum flow: 0.3M³/min | |
Cooling Water | 1. Total intake pipe: G3/4" |
2. Connecting pipe: 2-G1/2" | |
3. Inlet pressure: 0.2~0.5MPa | |
4. Minimum flow: 0.8M³/h | |
5. Inlet temperature: ≤35°C | |
Working Condition Temperature | 1. Automatically exit device: -20°C~100°C |
2. Control device: -5°C~75°C | |
3. Furnace temperature: <=1700°C | |
Dimension | 1. Handle exit device: 1000*400*305mm |
2. Control box: 400*500*250mm(W*H*T). | |
3. Manipulator (there are three type, if you need to order it please specify). | |
3-1 Software operation (see figure). | |
3-2 Flush mounting (see figure). | |
3-3 Cabinet mounting or place on the operating desk (see figure). | |
4. Installation diagram: (see figure ). | |
5. Open pore requirement (see figure). |
Changzhou Luming Photoelectric Technology Co.,Ltd was founded in 2013, It is located in Changzhou Jintan Economic and Development Zone, No.900 Chenfeng Road, Liandong U Valley. It is a comprehensive high-tech enterprise integrating R&D, production, sales, and installation services.
We provide diversified products such as high temperature camera system, portable high temperature camera, endoscopic high temperature CCTV system, infrared thermal camera system, kiln scanning and measuring system, ball mill sound measuring system.
The product specifications are complete and are widely used in cement, steel, glass, thermal power, waste-to-energy, chemical and other industries. The company has explosion-proof certification, ISO9001 certification and a number of invention patents. In order to meet customer requirements, the company has long-term cooperation with major well-known schools and designs Experts from the institute conduct academic discussions and technical research and development.
Our company has undertaken a large number of high-temperature furnace CCTV projects at home and abroad, and our products and services have been well received by customers. We are committed to helping more factories achieve high-quality development of safety, efficiency, intelligence and environmental protection.
Innovation is the life of an enterprise. In recent years, our company each year invests more than 3 million yuan in research and development, by actively cooperating with universities and research institutes to improve and explore our own R&D strength in-depth step by step, we have developed successively a number of leading new products, far ahead of the our counterparts in same industry.
Our company attach great importance to corporate culture, and strives to integrate the eastern traditional thoughts with the western modern management concept, so as to explore a system of modern enterprise management. The company advocates culture of water, use sea-like broad mindset to accommodate and embrace, to inherit and learn from all. our company advocates Sinology and educates workers with traditional Chinese culture, and regards filial piety, benevolence and justice, loyalty and sincerity as the ethical principles of workers. The company emphasize various forms of employee training, endeavor to standardize employees' behavior with Tao, and improve employees' skills with techniques.
We aims to strengthen the enterprise's scientific and technological innovation ability, ensure customers with good product quality and perfect services based on giving full play to the allocation of market resources, all these will lay a solid foundation for Changzhou Luming to develop to be top production base of high-end monitoring device industry.
Package: Standard export package(Carton box or Wood box)
MOQ: 1PCS
Loading Port: Shanghai,China
Delivery Time: 15~25 working days
Q1:Are you a manufacture or trade company?
A1:We are a manufacture, we have our own factory.
Q2: How about the warranty?
A2: The warranty is 18 months after you received the products.
Q3: What's the delivery time?
A3: Usually 20 working days after received the payment.
Q4: How about terms of payment?
A4: Usually 100% T/T before shipping, if the quantity is large and the amount is large, teh terms of payment are negotiable.
Q5:What's the MOQ?
A5: 1 pcs
Q6: What's the delivery time?
A5: 15~25 working days after receiving payment