Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

Customization: Available
After-sales Service: 2 Year
Warranty: 1 Year

Products Details

Basic Info.

Model NO.
LVJOE-GPPL11
Voltage
380V, 50Hz
Machinery Test Report
Provided
Features
Durable Performance, Energy-Saving, Eco-F
After-Sales Provided Service
Engineers Available to Service Machinery Overseas
Dust Collecting
Electrostatic Precipitator; Clean
Oven
Vertical Type, Land & Money Saving
Raw Material
Gypsum Rock, Additives
Steel Structure
We Can Supply
Business Type
Manufacture
Control System
PLC Center Control
Calcination System
Vertical Boiling Furnace
Dryer Technology
Heat Transfer Oil; Hot Air
Fuel
Coal; Diesel; Natural Gas; Heavy Oil
Workers
5 Person Per Working Shift
Ore Consumption (Tons/Year)
360000
Transport Package
in Containers or According to Requiremen
Specification
30000-500000 tons per year
Trademark
LVJOE
Origin
China
HS Code
8474209000
Production Capacity
100 Sets Per Year

Product Description

Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

 
The Brief Introduction of the Production Craft
 
Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology
    The crusher breaks large gypsum rock into small particles of less than 25 mm in diameter, the particles go through storage and transportation equipments into the mill for grinding, use a powder concentrator to select qualified gypsum powder of required fineness and send them into the boiling furnace for calcination. The left unqualified particles will return to the mill for regrinding until meet the requirement. Calcined qualified gypsum powder will be send into the clinker silo for storage or to the workshop for use.
 


 
The Flow Chart of the Craft


Jaw crusher   --    Hammer crusher    --     Lifter    --    Material silo   --   Measuring pump    --     Mill    --   Selecting powder machine   --   Lifter  --   Raw materials silo   --Screw feeder  --    Fluidzed bed furnace   --    Electrostatic cleaning   --   Cooling   --  Lifter    --    Finished material silo.

Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology


 
Gypsum powder production line capacity list 
 
 
Capacity/T

Ton/hour

Raw gypsumrock consumption T/year
 
Heat supplying way
 
Boiling furnace size
30,000 4.2 36,000   4.5M×1.2M×1.4M
50,000 6.9 60,000 4.5M×1.4M×1.6M
60,000 8.3 72,000 4.5M×1.6M×1.8M
80,000 11.11 96,000 4.5M×1.8M×2.0M
100,000 13.88 120,000 4.5 M×2.0 M×2.2 M
150,000 20.83 180,000 4.5 M×2.2 M×2.4 M
200,000 27.77 240,000 4.5 M×2.4 M×2.6 M
300,000 41.66 360,000 4.5 M×2.6 M×2.8 M


Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology
 

Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

 
 
Our Adavantages


1.High Efficiency
Under the same finished final size and the same motor power, the capacity of the machine is twice as much as jet mill, mixing grinder and ball mill, and energy consumption decreased 30%.

2.Long life cycle of spare parts
The ring and roller are forged by special material with high utilization,the lifetime can reach 2-5 years for grinding calcium carbonate powder.

3.High safety and reliability
As no rolling bearings or screws in grinding cavity, there are no problems caused by bolts shedding or rapid wear of bearings and seal components.

4.High fineness, flexible adjustment
The final fineness of the grinding materials can be adjusted between 325 meshes and 2500 mesh (47-5 micron), and the product fineness can reach D97≤5μm.

5.Environment-friendly


Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology


 
After Sales Service

1. Our company has professional installation & commissioning teams, we will install and debug 
the production line at the customers' place until the equipment produces qualified products.

2.
We supply spare parts all the year round. The guarantee of equipment is one year. 


3.
We are responsible for the technical consultation and service all the year around and help 

to solve all kinds of technical problems at any time.

4.
We will help customers do the consignment and the relevant procedure for import and 

export.

5. Our company supply the information of the seller for all kinds of raw materials and relevant information for free.


 
Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology
Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology
Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology


 
Company Profile

    Hebei LVJOE Machinery Manufacturing Co.,Ltd  was established in 1998 and was professional in designing and manufacturing all kinds of industrial equipment, it had 300workers and more than 80sets of processing machines which include 2 sets of planer machines, one set of milling machine, 2 sets of boring machines, 3 sets of the lathe and several sets of newly imported CNC equipments.

    Mainly products are Gypsum Board Production Line, Gypsum Powder Production Line, Gypsum Block Production Line,and Gypsum Ceiling Board Production Line,etc.

    They had been exported to Afric,Mideast,Southern Asia,Eastern Europe etc. We will make effort to supply more high quality products to you!



Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology
Full-Automation Gypsum Plaster Powder Mill Production Line/Plant with Boiling Furnace Technology

 
FAQ

Q1: Are you a manufacturing factory?
A1: Yes, we are a manufacturing factory with 30 years of experience.
 
Q2:What is the price of the equipment?
A2:The price of different production capacity is very different, please confirm the annual production capacity, Then contact the sales for quotation.

Q3:How long is the warranty period?
A3:We provide 1 year warranty and lifetime maintenance.

Q4:Do you provide installation and commissioning services?
A4:We provide one-stop service, from design and manufacturing to installation and commissioning until the production of high-quality gypsum board.

Q5:How about after-sales service?
A5:what services will be provided after signing the contract, what services will be provided after the factory is put into production, detailed consultation sales, she will answer you.

Q6:What should I do if I don't know how to build a gypsum powder factory?
A6:As long as you have money and ideas, we have specialized in turnkey projects for 30 years to deliver a profitable factory for you.


Q7:What are the successful cases you have done?
A7:We have built gypsum powder factories for customers in many countries. Please consult sales for detail cases.
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours